Electrical Engineering 123 - Fall 2010 - Murat Arcak
Pace of the course is too fast
Number of Respondents
26
Mean
2.7
Standard Deviation
1.4
Median
3.0
95% Confidence Interval
2.7 ± 0.5
Max
5.0
Frequency Distribution
1 | 8 (30.8%) |
---|---|
2 | 2 (7.7%) |
3 | 6 (23.1%) |
4 | 5 (19.2%) |
5 | 3 (11.5%) |
N/A | 0 (0.0%) |
Omit | 2 (7.7%) |