Electrical Engineering 20N - Spring 2010 - Howard Lei

Is well prepared

Number of Respondents
28
Mean
4.0
Standard Deviation
0.6
Median
4.0
95% Confidence Interval
4.0 ± 0.2
Max
5.0
Frequency Distribution
1 0 (0.0%)
2 0 (0.0%)
3 5 (17.9%)
4 17 (60.7%)
5 6 (21.4%)
N/A 0 (0.0%)
Omit 0 (0.0%)
[Email HKN about this data]