Electrical Engineering 120 - Spring 2010 - Babak Ayazifar
Pace of the course is too fast
Number of Respondents
95
Mean
2.0
Standard Deviation
1.1
Median
2.0
95% Confidence Interval
2.0 ± 0.2
Max
5.0
Frequency Distribution
1 | 35 (36.8%) |
---|---|
2 | 31 (32.6%) |
3 | 21 (22.1%) |
4 | 3 (3.2%) |
5 | 4 (4.2%) |
N/A | 1 (1.1%) |
Omit | 0 (0.0%) |