Electrical Engineering 225B - Spring 2006 - Avideh Zakhor

Pace of the course is too fast

Number of Respondents
8
Mean
1.9
Standard Deviation
0.8
Median
2.0
95% Confidence Interval
1.9 ± 0.6
Max
5.0
Frequency Distribution
1 3 (37.5%)
2 3 (37.5%)
3 2 (25.0%)
4 0 (0.0%)
5 0 (0.0%)
N/A 0 (0.0%)
Omit 0 (0.0%)
[Email HKN about this data]