Electrical Engineering 100 - Summer 2005 - B Muthuswamy
Pace of the course is too fast
Number of Respondents
37
Mean
2.8
Standard Deviation
1.1
Median
3.0
95% Confidence Interval
2.8 ± 0.4
Max
5.0
Frequency Distribution
1 | 5 (13.5%) |
---|---|
2 | 10 (27.0%) |
3 | 13 (35.1%) |
4 | 5 (13.5%) |
5 | 3 (8.1%) |
N/A | 0 (0.0%) |
Omit | 1 (2.7%) |