Electrical Engineering 244 - Fall 1990 - Patrick McGeer

Pace of the course is too fast

Number of Respondents
13
Mean
3.1
Standard Deviation
1.0
Median
0.0
95% Confidence Interval
3.1 ± 0.5
Max
5.0
Frequency Distribution
1 1 (7.7%)
2 0 (0.0%)
3 7 (53.8%)
4 1 (7.7%)
5 1 (7.7%)
N/A 1 (7.7%)
Omit 2 (15.4%)
[Email HKN about this data]