Electrical Engineering 239B - Spring 1992 - Allan J. Lichtenberg
Is well prepared
Number of Respondents
10
Mean
3.0
Standard Deviation
0.9
Median
0.0
95% Confidence Interval
3.0 ± 0.6
Max
5.0
Frequency Distribution
1 | 0 (0.0%) |
---|---|
2 | 4 (40.0%) |
3 | 2 (20.0%) |
4 | 4 (40.0%) |
5 | 0 (0.0%) |
N/A | 0 (0.0%) |
Omit | 0 (0.0%) |