Electrical Engineering 231 - Spring 1993 - Chenming Hu
Pace of the course is too fast
Number of Respondents
22
Mean
2.7
Standard Deviation
0.9
Median
0.0
95% Confidence Interval
2.7 ± 0.4
Max
5.0
Frequency Distribution
1 | 2 (9.1%) |
---|---|
2 | 6 (27.3%) |
3 | 10 (45.5%) |
4 | 3 (13.6%) |
5 | 0 (0.0%) |
N/A | 1 (4.5%) |
Omit | 0 (0.0%) |