Electrical Engineering 225C - Spring 1993 - Jan Rabaey

Pace of the course is too fast

Number of Respondents
15
Mean
3.1
Standard Deviation
1.0
Median
0.0
95% Confidence Interval
3.1 ± 0.5
Max
5.0
Frequency Distribution
1 1 (6.7%)
2 1 (6.7%)
3 7 (46.7%)
4 2 (13.3%)
5 1 (6.7%)
N/A 0 (0.0%)
Omit 3 (20.0%)
[Email HKN about this data]