Electrical Engineering 226B - Spring 1994 - V. Borkar
Required course material is sufficiently covered in lecture
Number of Respondents
4
Mean
4.5
Standard Deviation
0.7
Median
4.5
95% Confidence Interval
4.5 ± 0.7
Max
5.0
Frequency Distribution
1 | 0 (0.0%) |
---|---|
2 | 0 (0.0%) |
3 | 0 (0.0%) |
4 | 1 (25.0%) |
5 | 1 (25.0%) |
N/A | 0 (0.0%) |
Omit | 2 (50.0%) |