Electrical Engineering 228A - Fall 1994 - Pravin Varaiya
Pace of the course is too fast
Number of Respondents
17
Mean
3.5
Standard Deviation
0.9
Median
3.0
95% Confidence Interval
3.5 ± 0.4
Max
5.0
Frequency Distribution
1 | 0 (0.0%) |
---|---|
2 | 2 (11.8%) |
3 | 5 (29.4%) |
4 | 6 (35.3%) |
5 | 2 (11.8%) |
N/A | 0 (0.0%) |
Omit | 2 (11.8%) |