Electrical Engineering 221A - Fall 1999 - Kameshwar Poolla

Pace of the course is too fast

Number of Respondents
41
Mean
2.8
Standard Deviation
1.1
Median
3.0
95% Confidence Interval
2.8 ± 0.3
Max
5.0
Frequency Distribution
1 4 (9.8%)
2 12 (29.3%)
3 12 (29.3%)
4 7 (17.1%)
5 3 (7.3%)
N/A 1 (2.4%)
Omit 2 (4.9%)
[Email HKN about this data]