Electrical Engineering 229B - Fall 2012 - Venkat Anantharam

Pace of the course is too fast

Number of Respondents
10
Mean
3.6
Standard Deviation
0.7
Median
3.0
95% Confidence Interval
3.6 ± 0.4
Max
5.0
Frequency Distribution
1 0 (0.0%)
2 0 (0.0%)
3 5 (50.0%)
4 4 (40.0%)
5 1 (10.0%)
N/A 0 (0.0%)
Omit 0 (0.0%)
[Email HKN about this data]