Electrical Engineering 229 - Spring 2003 - Venkat Anantharam
Required course material is sufficiently covered in lecture
Number of Respondents
19
Mean
4.3
Standard Deviation
0.9
Median
4.5
95% Confidence Interval
4.3 ± 0.4
Max
5.0
Frequency Distribution
1 | 0 (0.0%) |
---|---|
2 | 1 (5.3%) |
3 | 2 (10.5%) |
4 | 6 (31.6%) |
5 | 9 (47.4%) |
N/A | 1 (5.3%) |
Omit | 0 (0.0%) |