Electrical Engineering 140 - Fall 1990 - Donald O. Pederson

Work load is heavier than for courses of comparable credit

Number of Respondents
24
Mean
2.8
Standard Deviation
0.9
Median
0.0
95% Confidence Interval
2.8 ± 0.4
Max
5.0
Frequency Distribution
1 1 (4.2%)
2 7 (29.2%)
3 10 (41.7%)
4 3 (12.5%)
5 1 (4.2%)
N/A 2 (8.3%)
Omit 0 (0.0%)
[Email HKN about this data]